Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. matth35

    Suggested experience for SE Exam?

    I've taken the new 16 hr SE Exam (Buildings) and passed. The test is heavily weighted toward seismic design category D. I do not have any design experience in SDC "D," so this made it difficult for me, but I was able to overcome this with a lot of studying focusing on SDC "D." If you can pass...
  2. matth35

    Best SE Study Course

    This may be a little late for your decision, but I can give you my experience. I recently passed the new 16 hour SE exam (building exam for essay portion.) I highly recommend taking some type of review course for this extremely hard test. I took the School of PE review course for the vertical...
  3. matth35

    Design of masonry infill walls

    My understanding of the MSJC 2011 Appendix B and the NCMA TEK 14-23 is that any and all masonry walls that fill in the open space of a concrete or steel framed building is considered "infill." The definitions of "infill" and "bounding frame" in the MSJC 2011 are pretty straight forward. This...
  4. matth35

    Masonry Stair Walls and Connection to Primary Structure

    I wander if the architect is applying the 2 hour fire SEPARATION rules to a 2 hour fire rated wall. The 2 hour fire separation intends for the structure to be separated from the fire wall, but I do not believe this should be applied to a fire rated stair well.

Part and Inventory Search

Back
Top