hello everybody. I need help with some basics about coming up with the cable schedule for a typical 33/11kV primary substation.I've been assigned to supervise a substation construction project and i'm finding some difficulty following what is been done,especially on the control wiring. I asked...
Exactly davidbeach,thats exactly what i'm talking about. i have attached a drawing of the steel tubular pole we are using.http://files.engineering.com/getfile.aspx?folder=bd86991f-3c85-4591-a558-27040ce66d3d&file=pole_sample.docx
thank you bacon4life,really appreciate it. looking through your solutions,we have tried the last option and we hope it KEEPS the insulator closer to vertical.
I however i need further clarifications on the first option -Extra bells/longer insulators- wont this further increase the swing? i will...
hi everybody,I'm new to this forum.
I am an electrical engineer with a transmission and distribution company. we are currently constructing a 33 kV OHL. Our problem is with the angles on the towers.
By the manufacturers specifications,angles up to 10degrees should be considered as light angles...