In a project that I am working on, the client wants to have a small (4mx4m) building build on top of an industrial building roof. The existing roof is covered with pre-cast concrete planks. Columns of the existing building are 4m apart hence the proposed building size. Looking at the...
Hi,
What is the standard codes of practice in the UK for loading on support to steelwork structure in river? Its not a bridge.
I have the Design Manual for Road and Bridges document but it is more for bridge piers rather than support in the river.
Thanks.
Thanks all for the advice. Yes it's a big cantilever gate with steel post thus the size.
The plan is to dig deeper than the slab and cast the post in with concrete.
Hi,
We are putting a steel gate post into an existing 225mm thick cocnrete laydown area. The concrete is reinforced with 10mm long bars (200mm c/c) and 6mm transverse bars (400 c/c). The slab normally carries flask transporters with 15tonne axle load.
A 1.2x1.2m hole will be dugged into the...