Hi,
I know is different, but I'm trying to pass MTBF to probability of failure, I have to justify that isn't necessary to buy 3 backup transmitters based in low probability of 2 or all transmitters break down in the same time. The model that I imagine is: I have a box with 10000 little balls...
I'm engineer electrician and electronic, I'm from Argentina, maybe you would assist me in the following question:
I have 3 FM transmitters, A, B, C. A has 3 failures / 10000 hours (MTBF = 3333 hours. B has 2 failures / 10000 hours (MTBF = 5000 hours) and C has 1 failures / 10000 hours (MTBF =...