Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Bmechz
  • Order by date
  1. Bmechz

    Small Hole in ASME B16.5 Blind Flange

    Kindly go through the below link in which HSB interpretation regarding opening on blind flange is available.. I hope this will help you... http://www.hsbglobalstandards.com/uploadedFiles/CTWeb/AllImages/PP-1999-06.pdf Bmechz
  2. Bmechz

    Heat treatment above and beyond

    Dear Jman69, You run a PQR with 2 cycle PWHT and prove that the mechanical properties are within the range.. Above mentioned clause UCS 68 is for exemption of impact testing, not related to the mechanical properties of materials after PWHT.. Bmechz
  3. Bmechz

    Foundation saddle loads due to OPE/HYD/wind/seismic

    Satheesh, In PV elite you may have consider o% seismic load for hydrotest condition.. In summary i think PV elite shows the seismic / wind load,whichever is more... Bmechz
  4. Bmechz

    Worldwide guide to equivalent irons and steels need

    Hi all, Did any one have the below mentioned hand book, if so please send me the link.. Worldwide guide to equivalent irons and steels.. Thanks and regards Bmechz
  5. Bmechz

    UHX Tubesheet thickness

    Dear MikeG7, Please refer UHX-4 - Note of ASME Sec VIII Div -1, there code says that if tubesheet thickness is less than the OD of tubes then designer has to consider the deflection.. Bmechz
  6. Bmechz

    weld joint consumable..

    Dear All, Now we are designing a vessel with shell as 12" XS pipe and Alloy 625 weld overlay inside and vessel ID after weld overlay is 284mm.. In the above vessel weld consumables to be used for shell to shell joint(category B)is alloy 625 but the vessel shell is designed for Carbon steel SA...
  7. Bmechz

    Appendix -2 calculation of flange joint

    Dear TGS4 Thanks for your feedback.. In some cases we can found that the bottom head or shell are overstressed due to hydrotest pressure, that is because of the high hydrotest pressure as per client specification(MAP in lieu of MAWP) in div-1. In general, induced stress during hydro shall...
  8. Bmechz

    Appendix -2 calculation of flange joint

    Dear all, Do we have to check the non std. flange in hydrotest condition as per appendix -2 of ASME Sec VIII Div -1? If so PV elite software is taking care of it or not ? As per my understanding PV elite is taking care of the Shell and Head part during hydrotest. If we model a body flange in...
  9. Bmechz

    Horizontal vessel saddle support weld size calculations

    Dear Chandanraj123, First of all let me know which weld size you want to determine, whether it the weld size between rib to base plate or base plate to deck (without anchor bolt) Bmechz
  10. Bmechz

    Design of Column with heat exchanger attached..

    Can anybody help me on the above subject Bmechz
  11. Bmechz

    PWHT cooling tolerances.

    Kindly mention the applicable code of construction.. Bmechz
  12. Bmechz

    MAWP and Safety Valve Set Pressure

    Dear MDARC, Please note that MAWP of the vessel shall not be less than Design pressure,you can consider MAWP same as design pressure code allows it. Regarding pressure relief valve , i think you can set a pressure Of relief valve between MAWP of vessel and Operating pressure. In no case set...
  13. Bmechz

    Design of Column with heat exchanger attached..

    Dear All, I have a column(U2 stamp) design with a heat exchanger attached to it with help of saddle, Client have provided us the Fx,Fy,Fz loads for both fixed and sliding saddle. Note that the vertical axis of column and heat exchanger is parallel to each other but the heat exchanger is...
  14. Bmechz

    Heat Exchanger hydrotesting

    Since the tubes side pressure is very less and customer doesnt want the hydrotest on the tube side, you perform hydrotest on the shell side and provide client PDR instead of MDR.. That means only a part of the heat exchanger is code stamped.. I think the NB reply is also trying to say the...
  15. Bmechz

    EXTENDING EXISTING NOZZLE REINFORCEMENT PAD

    Roca.. Try to add internal RF pad, ie. inside of the vessel you can add pad to get more reinforcement area.. Baijuz
  16. Bmechz

    Heat treatment requirement for cladded vessels

    Thanks for your reply... Baijuz
  17. Bmechz

    Heat treatment requirement for cladded vessels

    Hi Metengr, Thanks for your reply, but i have a doubt regarding the material.. As per UCL 34(b), they talks about the chromium stainless steel and they haven't used a word of martensitic stainless steel and as per my understanding Type 410 comes under martensitic stainless steel which is not...
  18. Bmechz

    Heat treatment requirement for cladded vessels

    Dear All, Kindly go through the below query and let me know your valuable feedback... Recently we have a vessel with SA 516 Gr. 70 base material and SS 316L internal cladding for corrosion resistant.. The max thickness of shell and dished end is 10 mm only. Design code is ASME Sec VIII Div 1...
  19. Bmechz

    Inspection opening requirement for U tube Heat exchanger as per ASME

    Hi Everyone, I have query regarding inspection opening requirement for U-tube heat exchanger with respect to ASME. In the MDR we have to mention the inspection opening details provided for each vessel constructed under ASME, so in case of Heat exchanger can we mention channel and shell flange...

Part and Inventory Search