We need help interpreting FAA-STD-019e sections 4.1.1.2.4.2 and 4.2.1.6 for a I/O panel grounding application entering a facility from a tower. We are familiar with the Motorola R56 requirements where the ground bus bar is separate from the metal bulkhead connector panel (i/o panel) , but are...
Hi Kenat, This is a great and in the right direction. However, if you were an inspector doing a first article inspection, what tells you if the stock dimension is correct?
Thanks. We have tried the note and the inspector's rebuttal was that "He doesn't have the tolerance from the 'controlling standard'". When you use this note, what directs your inspector's to handle the inspection of the stock dimension to the note's controlling standard?
Hi. Can someone know of a specification that instructs inspectors how to properly interrupt a stock dimension? Currently, they are applying the drawings tolerance block leading to rejections and conflicts with our vendors. Thanks.