  1. asadurrehman

    Difference between Battery discharge period and Discharge rate

    Dear Please elaborate "Difference between Battery discharge period and Discharge rate" my understanding is like this that the battery discharge period/ duty cycle is the requirement by a company while the discharge period is the manufacturer rating of the battery without reaching its cutoff...
  2. asadurrehman

    Ventilated Cable Tunel

    Good Day! I need some Technical Data and guidance about Ventilated Cable tunnel for Power cable. Kindly recommend. Asad
  3. asadurrehman

    Connecting substation mesh with Terminal tower compound mesh

    If the area is not sufficient to lay more conductor then Can we consider terminal tower compound area near the substation area in the design by connecting the Mesh of substation with the mesh of Tower compound mesh through a reasonable size of conductor?
  4. asadurrehman

    Grounding Design with Very High GPR

    Thanks a lot for your responses. We have FO cable for automation and communication purposes. The normal practice is to keep it close to 5000V. However, we have a situation that adding more conductor and rods is not having any considerable impact on GPR. The reinforcement of concrete , piping and...
  5. asadurrehman

    Grounding Design with Very High GPR

    Hello I am handling the design of a substation limit whose grounding design is with with very high GPR, while Step and touch are within limits. The normal practice is to use conductor and rods. What possible method is to bring GPR close to the acceptable limit. Can I use remote contribution less...