Normally for PVC pipes also Classes are specified instead of Schedule. However general practice for CS ans SS pipes is to follow Schedule as per B36.10 and B36.19
Hi
I have a Low Temp (A350 LF2) RTJ flange which has requirement for weld overlay on flange face. My query is that
1) Can we deposit the weld overlay and then go for machining. in this case the gap between the two flanges will be increased by the weld overlay. Or is it general practice to...