  1. pkloo80

    API620 Tank perlite change out (Product: Ethylene & propylene)

    thank for the replied. Do this tank required to Decomminisioning before carry out this perlite changeout? When some part of the perlite was icing and we suspect there was a leakage ether from inner wall or outer wall. I feel this might involve alteration. Thank
  2. pkloo80

    API620 Tank perlite change out (Product: Ethylene & propylene)

    Hi there, Anybody in this group experienced on the Tank 620 perlite changeout? So far didn't read any article on this matter. Please share if anyone come across his. Thank
  3. pkloo80

    Code & standard to repair damaged import center suction and Side entry mixer flanges

    Dear all, Kindly help me to define which code and standard that require to be refer for the damaged flanges repair? Thank Marvin
  4. pkloo80

    API 650 - Air leak test on Bottom Sump, Manhole reinforcing and Nozzle reinforcing

    Hi, I had a doubt on my QC department that created a procedure of air leak test with below requirement: Pressure: 1 bar Holding time: 5 min Additional: Soap solution Can anybody here help me to clarify this requirement, Besides that I can't find any requirement on the 1 bar pressure with...