  1. 111ggg

    Transformer Incomplete operation

    What is the approved way to function test an incomplete tap change operation on a 138KV Smit transformer?
  2. 111ggg

    Siemans anti-pump relay function test procedure

    What is the perferred way to function test a (52Y} anti-pump relay on a 138KV Siemans SF6 breaker prior to putting this breaker in service?Siemans anti-pump relay function test
  3. 111ggg

    load shedding etc.

    In a substation with transformers, feeder rows and a control room, how would you explain the difference between load relief, load shedding and load stripping?
  4. 111ggg

    Single point ground on a ct circuit

    After much on the job discussion, what is the primary reason to have just a single point ground on a CT circuit?
  5. 111ggg

    Transformer Load Relief

    In a substation with a 230KV / 13.8 KV transformer feeding five feeder rows. What would the typical sequence when load relief 1 and 2 is initiated. Also what is the purpose of the 200 ohm resistor in series with the 487 leading to the coil of the 94 relay?
  6. 111ggg

    Differential operation on transformer

    For a 230/13.8 transformer in a substation feeding five feeder rows,what is the general operation sequence after a differential transformer operation? The control house contains SEL 487E relays and SEL 451 relays in the feeder rows.