Tmoose,
You are right, the problem that Client is not accepting the current status and he is considering this shape is not meeting the HSE requirements, we have huge quantity which is already erected, we need to find a solution away from cutting and welding
What are the best solutions to solve the issue of sharp edge shown in the below photos
We have huge quantity and client didnt accept the current status
Gents,
I have a crowded area of foundations, want to use the sand cement mix for backfilling, 50 kg cement for 1 MT of sand
my question is how much the water ration shall be
I need a reference please
Hi Guys,
please try to help me urgently,
I need the details of layers below the flooring tiles/Ceramic, and the most important thing my client is asking me for the reference
we already waited 28 days and did the special tests on the existing footing, it failed
client didn't accept to check and adjust the design for 22 Mpa
we have 2 options
1-remove the footing and reconstructing from the beginning
2-cont the pedestal bars and consider the existing footing as...
We have poured the concrete of footing in foundation (please see the picture)
the required concrete strength is 28 Mpa but it fail on 22 Mpa,
what are the best solution for such problem
http://i57.tinypic.com/2rmsax4.jpg[/IMG]]
when we calculate the hollow block resistance, for the stress shall we consider the whole area of the block or we have to deduct the hole areas from the block surface area
R=P/A
A: with holes area or without?
Hi,
I am preparing the method statement of precast concrete manholes , what are the tests we have to do for the manholes before the backfilling.
Thanks
What are the procedures and conditions that we must take in order to lift the precast concrete foundation, specially after how many days of pouring we can lift the foundation