in 13.8 KV switchgear , we have the CT body is connected to the Live bar , already we did the HV test for BB and it was passed with the same connection , Do you have any idea why the manufacture do the connection like that .attached photo
thread238-307149
I hope the attached excel file will help you to get the operating current values for transformer differential protection up to 4 winding and also give u the required injection in amps and angles to verify the slope characteristic of the relay .
I make this sheet based on the...