I am bidding an 8" sewer line project in granite bedrock. The average depth is 10' with a slope of 1:1. I plan on using a 100,000 lb. excavator (cat 349)with a rock bucket. Does anyone have an idea of production rates or a resource I could find them?
Thanks for your help.