Sorry I have been out of town.
I will attempt to answer the questions.
First of all the we have 10 4 story buildings that are concrete construction both exterior and all demising walls between units.
They are apartments
The buildings are orientated in all directions (my thought is this is one...
HerrKaLeun
The systems are basic splits in 1.5,2 and 2.5 tons and 14 seer.
Humidity is the problem.
The data entry for the two programs were apples to apples.
All
I have a 273 unit apartment project in Florida that the Carrier HAP program was used for the design.
We are currently having a number of problems that seem to be caused by the units potentially being over sized.
An outside consultant ran the calculations with the Manual J program and there...