Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. lnbeauch

    Trane Trace 700 run-hours for specific equipment

    thread403-142869 Does anybody know how to get Trane Trace 700 to show calculated run-hours for specific pieces of equipment? For example, I am trying to see how many run-hours are being calculated for room exhaust fans for three different alternatives.
  2. lnbeauch

    Different receptacle loads between alternatives using Trace 700

    I'm replying to my own thread, in case someone has a similar question, here is the solution (many thanks to the technical support person at CDS). If any of the alternates include an energy recovery fan, the "parasitic load" to run this fan is added, in the energy summary reports, to the...
  3. lnbeauch

    Different receptacle loads between alternatives using Trace 700

    I did use the "Use Alternative 1" option, and when I go through the templates for all options, the miscellaneous loads are the same (load, meter, schedule, type) for all alternatives, so I don't understand where the different plug loads come from. I have contacted the support, thanks for your...
  4. lnbeauch

    Different receptacle loads between alternatives using Trace 700

    I am using Trane Trace 700 to model three alternative mechanical systems. I have tried to keep all of the envelope, ventilation, lighting, and internal loads the same between the alternatives, to focus on the energy and economic effect of the different mechanical system choices. For this, the...

Part and Inventory Search