Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. dodgeybro

    AS60079 Hazardous Area Dossier

    Thanks GroovyGuy, Your right, I oversimplified my statement a little and there are zones 1 and 2 around evacuation pipework and vents. I guess I was just trying to work out if the Hazadous Area Dossier is tied to the Hazadous gas, or the electrical installation. ie Do I need the Dossier if...
  2. dodgeybro

    AS60079 Hazardous Area Dossier

    Hi Guys, I am managing a project were we are using an electrolysis to produce chlorine for water dosing, with H2 byproduct. Hazardous area classification is completed and we've ensured that no electrical equipment is installed in the classified zones. My question is if there is no electrical...
  3. dodgeybro

    Digital Tenency Metering Reading Import and Export load

    Hi guys, I have a new installation with a large number of digital tenancy energy meters that are accumulating both Import and Export kWh. Units are not yet occupied and load should be zero, apart from some control circuits on Hot water etc. These are apartment units with no generation...

Part and Inventory Search