Search results for query: *

  1. ChemEngr77

    Piping Identification

    I am a Chemical Engineer working in a hydrocarbons facility. How do we visually identify the difference between Carbon Steel (CS) and Low Temperature CArbon Steel (LTCS)? The piping has already been erected on-site.
  2. ChemEngr77

    Pump Seal Plan 53A and Plan 53B

    In the event of Nitrogen failure on seal plan 53 A & Plan 53B is it advised to keep the pumps in operation ? Thanks. Regards.
  3. ChemEngr77

    Seal Plan 53A and 53B

    I am Chemical Engineer working in Petrochemical plant operations for 14 years. At my complexwe have seal plan 53A and 53B for various pumps. Seal pot require Nitrogen. In the event of Nitrogen failure is it suitable to keep the pumps running ? Thanks. Regards.