Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. amorton5

    D1.2 Maximum weave width GTAW

    Hey everybody, Welding a bunch of 1/2" fillet welds on aluminum, using ER4043. The welders are putting in a root pass, one cover pass and then waving the cap or cover pass to complete. They are using 3/16" tig wire and up to 1/4" tungsten. Does anyone know the maximum weave width for AWS...
  2. amorton5

    Subcontracted weld testing

    Example- Bottom of WPQR would read Weld test conducted by: Contractor Represintitive Mecanical Tests Conducted by : Myself The contractor basicallly wants to have a CWI perform the QW-462.3, QW-462.2 and QW-302.4 parts of the welder "qualification" process. I do not believe you have to be a...
  3. amorton5

    Subcontracted weld testing

    GTAW Let me explain the situation..... I am a CWI admittedly not the most experienced in the world. I've spent a lot of time working directly for construction contractors dealing with mostly ASME Sec I and B31.1. Recently, a small contractor that does not keep a full time CWI on staff...
  4. amorton5

    Subcontracted weld testing

    So can the 3rd party CWI fill in the ranges qualified etc on the certification and sign the bottom with the contractors name with permission? Or does the person filling in the certs information have to physically be on the companies "pay roll" for say? Just to clarify sorry guys
  5. amorton5

    Subcontracted weld testing

    Per asme IX or AWS D1.1 and D1.2 can a contractor perform the welder performance qualification test at their shop. At completion of the weld test can they send the completed test coupon off to a 3rd party for review, guided bend test and receive certification for that welder? My question is...
  6. amorton5

    R stamp requirements

    So I'll also have to build a knock out pot for demonstration. So this would be more or less a required practical test for the review? Correct me if I'm wrong? Thanks!
  7. amorton5

    R stamp requirements

    I apologize for some of my lack of understanding. I've been on the production side of things my whole career. Started working in the QC department just over a year ago so I'm still fairly new. Thanks again everybody for any good help!
  8. amorton5

    R stamp requirements

    Okay great! Very helpful guys thank you! Now let me ask you this? I am currently Field QC manager for the company I'm working for. We have an R stamp and I have access to our QC manual and I have personaly prepared most of our PQR/WPS's. I have many with PWHT and many that don't require it per...
  9. amorton5

    R stamp requirements

    I am a boiler construction superintendent/ QC inspector. I'm fairly proficient with ASME sec 1, 9 really anything thing that has to do with making repairs and alterations to power boilers. Over the past year or so I've been trying to get the right people together to start my own company, I have...

Part and Inventory Search