The trenches are full depth and long lengths...the need to move kitchen plumbing to different area in the building. After de-stressing and the cable are cut, can I re-anchor the cables and re-stress, or is there another method. Also, the areas that don't have post tensioning, should I heavily...
I need to trench through an existing post tensioned slab on grade here in Texas. My opiniion is to relax the tendons in the area and retension afterwards. Any helpful hints would be greatly appreciated. Thanks!!!