  1. abk453

    Lighting Arrester should be after or before the cutout fuse (which protects the pole mounted XMR)

    Thanks all for your suggestions.Actually, the production loss is the big factor here as fuse is before lightning arrester(LA) . My logic is to put LA before fuse to reduce frequent fuse blown which will ultimately reduce oil production loss. I know the lead length is a issue for LA but how...
  2. abk453

    Lighting Arrester should be after or before the cutout fuse (which protects the pole mounted XMR)

    We have 34.5kV distribution line where the Lightning Arrester(LA) is installed after the fuse and primary side the pole mounted transformer. So, when the lightning hits then fuse blown and create interruption and company losing money because the oil wells do not have power. I am thinking of...
  3. abk453

    Neutral Stabilizer for loop operation

    I am designing a neutral stabilizer circuit for 13.8kV ,3000A switchgear. We are back feeding the 13.8kV switchgear by from 2400V bus through 5MVA( wye-delta)transformer while open the 13.8kV main breaker from Unit Auxilary Transformer (delta-wye) . Could anyone please let me know is there any...
  4. abk453

    Arc Flash energy calculation equation of ARCPRO software

    Does anyone know the Arc Flash energy calculation equation of ARCPRO software