Hello every one,
I want to design pile raft foundation using sap 2000.can i get reasonable values for the designing.what is the best way to design the pile raft. I have some borehole data and the area is actually a hard clay.Please give some details regarding this issue...
Thanks..
Hi all,
I want to know how to connect slab to retaining wall at each floor levels in under ground structure.Do i have to draw a beam at each floor level on retaining wall and slab junction to transfer loads.