Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Prosser

    Foundation Design - Back to Fundamentals - Layered Clay Soils

    Thanks for the feedback guys, I wasn't aware that studies were not discussed on here but to clarify, I am a Highways Engineer studying to progress my knowledge of topics that effect my day to day role, I am not a full time student looking for a shortcut. In this particular case, the soft clay...
  2. Prosser

    MX Drainage for gully design

    I have recently been involved in a development scheme in the middle East and attempted to use MX Drainage to determine appropriate gully spacing rather than using the traditional method of a spreadsheet with calculations from DMRB Gully Spacing. However, I had some quite significant problems...
  3. Prosser

    Foundation Design - Back to Fundamentals - Layered Clay Soils

    I am currently studying for an MSc and I am attempting to determine bearing capacity and settlement in a layered clay soil with weak clay overlying stiff clay. I aim to design the foundation by fixing the length at 12m (assumption due to bridge deck = 12m) and determining width using Das...

Part and Inventory Search