MJCronin
thank you for your help. i am using Aspen hysys for simulation porpuse.I already got the benefits of using the side reboilers to cool down the feed and reduce the refrigeration duty, i just need for some guidelines to decide about the following:
-on which trays i can attach the side...
hi guys,
currently, i am working on simulation model for NGL recovery. the scheme that i used is GSP (gas subcooled process) and i am confused about the parameters that i have to consider to figure out the best location and number of side reboilers. besides, how much the duty of side reboilers...