by the way I'm a young engr, with only a year of work experience. :)
it will be located at an urban area, just behind a six-floor bldg. the site has an existing tall roofing and enclosed with walls. it is a former automobile service center. the project will not include roof (because there is an...
When do we need to provide footing tie beams? and when is it not necessary? economically speaking.. i have a proposed 3-storey building with columns at 1st flr to 3rd floor of 2.5M height and 0.4x0.4M dim., i've read that for short columns, ftb is not necessary.. the building will be used for...
what is the "minimum" depth of a footing from the ground line if the building is a three-storey with no roof load. i was thinking of 0.5 M depth due to an existing drainage system underground. thanks!