This is my readings from flow meter shows upstream of pipeline:
Combined Flow reading MPFM:
Liquid flow rate - 7214 STB/D
Oil flow rate - 6480 STB/D
Water flow rate - 735 STB/D
Gas Flow rate - 2 mmscfd/D
Water cut - 10.2%
GOR - 354 SCFT/BBL
Hi LittleInch,
I need a software to help me with the exact calculation of pigging data. I want to be able to check in an Excel sheet using some relative data and formulas. Accuracy isn't crucial, but I need to be able to provide my supervisor with an approximate timing of the pigging receiver...
We flow the production of Oil & gas without being separated from the discharge wellhead towers and reach to 60 km destination area which will be separated by 3 phase separator. if not considered the GOR ? are you sure why should not consider it both a Crude oil mixture of oil & gas. Pressure...
Hey everyone, thanks for the feedback and additional information.
I need a precise calculation for future pigging operations as the rough estimation took a long time. The sea line has multiple sections with varying wall thickness, which affects the pig's speed in reaching the arrival area...
Hello experts,
Thank you for your response. I wanted to clarify that the GOR unit states that GOR = 353 SCFT/BBL.
My oil producer wells are producing more oil and a little gas, around 2 MMSCFD/day. However, the pig has not reached and it's not possible to reach in 2.9 hours, it should take...
Dear Experts,
I'm currently working on an upstream oil and gas project where we are conducting a BIDI pigging operation on a 16" MOL line that spans 50 km. I need help creating an Excel sheet to calculate the estimated time of arrival (ETA) for the pigging operation based on the following...