well turning on and off the air compressor is much costly as they are steam driven and lots of startup and shutdown work..so not a better choice
air flow require is varying from 50000NMC/hr to 55000NMC/hr and compressor discharge is almost60000NMC/hr
Hi every one
i got a project of reducing noise at air vent
air is required by process and it is provided by two air compressors the excess quantity is vented to atmosphere
the venting of air produces much noise almost 120db. so we have to reduce that noise.
what you suggest??
before explosion N2 blanketing was not practice but after that it is continuous
Seal oil tank is operated under atmospheric conditions
but this is temporary solution,
again i elaborate, we have two seal oil tanks( on for sweet oil(explosivity>30%) and other as reservoir(Explosivity=NIL), after...
A) we have provided N2 to at least start plant and resume production.
B)OKay dear i agree that permanent solution is dry gas seal installation but here is a huge cost for revamp as its a dual train plant with 2 synthesis compressor(each with three casing, 6 end seals) and 2 refrigerant...
Hi dears,
i have a project related to seal oil gas carry over with sweet oil in reservoir,
on a synthesis compressor consisting of three vertical split casing(suction pressure=25kg/cm2 and Discharge pressure=150kg/cm2) wet oil seal are used, complete seal oil system is working properly...