Metengr, bpv66,
The vessel is an ASME VIII Div 1 vessel. The WOL was also done by an ASME certified shop. From my understanding and bit of experience in code work, materials can be accepted without PDR from the supplier because;
1) The WOL was a requirement from the client only and requested as...
Thank you so much all.
metengr, i have tried to find what part of the code provides for the assertion that the material does not need PDR, because, first-off, the weld overlay was not considered as part of the strength of the tube, secondly, the WOL did not form part of the weld.
Please help...
Thanks for all your input guys.
qaqceng, Yes, We are actually ASME certified. The code in reference is ASME Sec VIII Div 1. The shop we procured from is also an ASME certificate holder. We specified that the materials will be used for an ASME code vessel, sent them PO and TDC with that...
Hi,
I work at a code shop and we recently procured some SS WOL pipes- stainless steel weld overlayed pipes. Unfortunately however, these items did not come with PDR from the pipe manufacturer to us. Now, these items have already been installed on the PV and the lack of PDR is an issue with the...