Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. ENGpetro

    Annular Unloading Efficiencies

    We're in an offshore field and annular unloading is a bit of an operational challenge. In case some may be unfamiliar with what we call annular unloading, we utilize gas lift in our field. Our wells sit in overbalanced completion fluid until they are handed over to production/operations. I...
  2. ENGpetro

    Gas Injector Cleanup

    Hey everyone, just wondering about industry best practice upon drilling and completing of gas injectors. One question floating around the office is do we need to flow back the next gas injector? We are in the offshore environment so there are significant savings if we can skip a flow...
  3. ENGpetro

    Gas Injection - JT Cooling Issue

    Ah yes, I should have mentioned that we are in an offshore setting and any additional equipment (although a viable solution) is going to be difficult and expensive to install especially another compressor. Ambient temperature is one of the drivers of the problem. Sea floor is at -2C
  4. ENGpetro

    Gas Injection - JT Cooling Issue

    Hello, We have a producing field with a single gas injector. Right now we are injecting into a pool with a reservoir pressure of ~23MPa. We're considering adding an injector in an adjacent pool, but the reservoir pressure is ~13MPa. As the two gas injection wells will be sharing a single gas...

Part and Inventory Search