I am an engineer and I see it as a normal question to other engineers who has already experience with this issue. If we will fallow this logic all of the question asked here on the forum should end up with the comment "Hire an Engineer who will help you with this"
If the system is designed with multiple chillers, and we are operating during part load conditions why do we need to run two chillers at low efficiency point? From energy point of view it will be much more economical to load just one chiller and switched off on of the CHWP.
My concern is if...
Sorry for posting it one more time but seems the post was deleted as I cannot find it on forum and in my threads.
In a constant flow chilled water system with 3 – port valves, 2 PCHWP what is the standard way of controlling of the system during the low load conditions? Does switching OFF one...