Hi Stephen,
Thanks for your reply.
Yes I know that is skipped, and PWHT is required.
I am seeking for the better solution, since our subcontractor mess up the activity because of scope change.
Even if we plan to perform PWHT on erected shell course, bottom Bitucell layer will get damage.
The...
As per API 650,
5.7.4.3 When the shell material is Group IV, IVA, V, or VI, all opening connections requiring reinforcement in a shell
plate or thickened insert plate more than 13 mm (1/2 in.) thick shall be prefabricated into the shell plate or thickened
insert plate, and the prefabricated...