Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. AME137

    When distributor between beds needed and when not?

    I have experience in packed bed design and redistribution should be done every 20ft or so. It depends on the size of the packing, gas factor, liquid load, tower diameter mainly. Let me know if you have particular questions.
  2. AME137

    Anyone Here Working In Caustic Or Chlorine Production Site

    I work in designing and fabrication of tower internals so i have experience with the equipment and MOCs used.
  3. AME137

    FOULING NIGHTMARE

    Hello, have you considered using a packed bed with fouling resistant liquid distributors? Somehting like y-slots or drip tubes with slots might work depending on the fouling and quantity.
Back
Top