  1. Crusader36

    Inspection Chamber at every Joint

    Dear techies, I have attached a pic of commercial sewer drainage line. Here the designer put Inspection chambers at every joint or junction. He put chambers at even 1.5mts distance which is just weird. I don't think this as proper way. If we keep adding IC at every joint and junction the whole...
  2. Crusader36

    Manhole VS Floor Clean out

    Dear friends, i was looking to clarify the difference between FCO and Manhole. I have done some study and read threads here but info is contradicting. 1.Look into the file attached where ground floor sewer line is depicted which utilises manhole at every point. I have been designing such models...
  3. Crusader36

    Sewer line through Basement

    What about the risk of getting flooded as it is in basement. Do we need to provide some extra protection like backflow valve etc. What if it rains and the and the water backflow through the Municipal line. Regards
  4. Crusader36

    Sewer line through Basement

    Dear Engineers, I have an issue to discuss. A customer approached me yesterday to get an engineering help regarding his problem. His building consists of basement and three floors above it. Previously I suggested him to have a pump at the basement to pump up the three toilets waste to ground...