    Traffic counts problem with Metro Count tubes

    Hello Engineers, Recently I was conducting traffic counts using tubes (MetroCount). However, one of the two tubes (which were placed 1 meter apart) were cut. Therefore, the traffic data is now not correct. Theoretically, I was thinking that one tube could be enough (not so accurate) for getting...
  2. Ali

    Bridge Deck Modification (after construction)

    Hello Engineers. Good morning. I have an signalized intersection in top of a bridge. I am planing to propose additional lanes to that intersection. My question is can I modify the kerb by cutting some of it adding another lane? How hard is to do that? thanks.