Stookeyfpe you are confusing two issues, this requirement was not eliminated in 2015 IBC. 403.3.1 does require a building over 420' to have two supplies. However 403.3.3 requires any highrise building in Seismic Design Category C, D, E, or F to have a secondary supply.