Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. JustinGonzales01

    Lift Station Pump Cycling Time

    This will be custom built. Thanks for your time, Justin Gonzales
  2. JustinGonzales01

    Lift Station Pump Cycling Time

    36.4 gpm is the peak hourly flow that is being designed for, the system is very small. We are not interested in sewage because this lift station is being used for residential waste water so the only water reaching the wet well is from the gravity lines. I agree with the 5-8 pump starts. Ideally...
  3. JustinGonzales01

    Lift Station Pump Cycling Time

    I am currently designing a lift station for a small subdivision. I have calculated the flow into the wet well to be 36.4 gpm (it is a very small system). The diameter of the force main leaving the wet well is 3 inches. I was able to calculate the total dynamic head which then allowed me to...
Back
Top