Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. bboosstteerr

    Cable construction selection best practices for avoiding noise in control circuits

    wroggent, thank you for awesome answer Sir, sorry I can't contribute to the thread due to my experience only 1 years in instrumentation
  2. bboosstteerr

    Cable construction selection best practices for avoiding noise in control circuits

    Hi OP, I'm curious whats your best practice for the analog signals? any references you used, thank you. sorry oot.
  3. bboosstteerr

    What software or methodology do you use to assess (risk, benefit) of your modification in plant?

    ok thank you sir sorry for my vague question i'll try to refine the next question.
  4. bboosstteerr

    What software or methodology do you use to assess (risk, benefit) of your modification in plant?

    do you have any books recommendations sir that you would say a must have?
  5. bboosstteerr

    What software or methodology do you use to assess (risk, benefit) of your modification in plant?

    I mean how true/close the estimation from doing such analysis for the cost and risk
  6. bboosstteerr

    What software or methodology do you use to assess (risk, benefit) of your modification in plant?

    Dear all, Supposes you already improved/modified some equipment, then how do you assess the risk or the benefit for the overall system/plant? any references thank you.
  7. bboosstteerr

    Why attemperator viewed as a losses in reheat steam turbine

    Im not quite sure of your last sentences, does it means because the steam is bypassed from hp turbine, the steam becomes not very useful
  8. bboosstteerr

    Why attemperator viewed as a losses in reheat steam turbine

    Or viewed as reducing efficiency, thank you
  9. bboosstteerr

    what is the purpose of restriction orifice multi holes in fly ash air pneumatic conveying systems

    the air pressure supply is 7 Bar. the plates only placed at the inlet after the on-off valve. this air is used for conveying fly ash of 6 economizer hopper in series . thank you
  10. bboosstteerr

    what is the purpose of restriction orifice multi holes in fly ash air pneumatic conveying systems

    Hi, from this link one of the purposes is reduced a noise Link, but what kind of noise? why its needed for inlet air conveying of fly ash from economizer hopper, Thanks.
  11. bboosstteerr

    anyone working with limit switch exposed to sea?

    wow thank you sir for the information i'll look into it.
  12. bboosstteerr

    anyone working with limit switch exposed to sea?

    This limit switch used for ship unloader of coal, its for control system.
  13. bboosstteerr

    anyone working with limit switch exposed to sea?

    Hi, Anyone have experience which brand/type for limit switch that is durable working in harsh condition (i.e corrosion) especially near sea. Thank you
  14. bboosstteerr

    is it normal practice for fire fighting system are separated from ovation operator station?

    Dear Eng-Tips users, Is it a normal practice for fire fighting system are separated or don't have a graphics in ovation operator station? I'm a fresh graduate working in coal power plant. in my company, fire fighting system using notifier onyxworks by honeywell so they have dedicated fire alarm...
Back
Top