Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. brvs2014

    Yee Wye Diverter

    There is a Yee type derivation for Pipeline, the objective is that two lines are marraneable and are connected by a Yee menconada, I would appreciate if you could help me with any brand or brands that manufacture this accessory or in turn some catalogs. Best regards.
  2. brvs2014

    procedure for load tests on a structural bridge

    if correct the tests of resistance of the point were made with load depending on the capacity for which the bridge was designed, now the problem that I have is that they ask me to indicate this procedure but in docuemntacion, there is some standard format to elaborate procedures for this kind of...
  3. brvs2014

    procedure for load tests on a structural bridge

    IN WHICH IS THE PROCEDURE TO PROVE THE BRIDGE'S RESISTANCE? THE BRIDGE WAS DESIGNED FOR TRAFFIC OF HEAVY CRUDE TRANSPORT VEHICLES
  4. brvs2014

    procedure for load tests on a structural bridge

    You could help me with a procedure for load tests on a structural bridge, we need to release the bridge and request the procedure of the load tests, I am grateful
  5. brvs2014

    Pressure Hidrostatic vs admissible pressure

    can the hydrostatic test pressure be greater than the admissible pressure?
  6. brvs2014

    how to justify that I can use API 5L gr B pipe since I do not have Api 5L x60 pipe

    thank you all for your answers, make a calculation memory with the admissible pressures of each material I hope that with this the client accepts the change
  7. brvs2014

    how to justify that I can use API 5L gr B pipe since I do not have Api 5L x60 pipe

    Under conditions of pressure and temperature the two materials fulfill satisfactorily, however the project has a great rush and the API 5L x60 takes too long to arrive, in all the previous projects we have worked with API 5L gr B and we have in stock this material , besides this contemplated in...
  8. brvs2014

    how to justify that I can use API 5L gr B pipe since I do not have Api 5L x60 pipe

    in a water reinjection project we use api pipe 5L Gr B, since the material is contemplated in the customer's Piping Class, however for this project a piping class was created in which the pipe is specified as Api 5L X60, the The customer does not want to accept the Api 5L Gr B pipe that was...
  9. brvs2014

    nozzles for bolted Tank

    I need information of the nozzles themselves with the feed, number of bolts and size of plates to screw the neck and the flange to the tank.
  10. brvs2014

    nozzles for bolted Tank

    I need the detail of the nozzles for bolted tanks, thank you very much help me with bibliography to review this topic, greetings
  11. brvs2014

    Should a choke valve always be used in reinjection pipes (reinjection wells)?

    Should a choke valve always be used in reinjection pipes (reinjection wells)?
  12. brvs2014

    Weld Pipe # 1500 WITH A FLANGE # 2500 NEED TRANSITION OR WELD DIRECTLY?

    Thanks for your answers it is very good to hear different points of view, however I have several derivations of this line that are specified in # 1500. I attach a photograph.http://files.engineering.com/getfile.aspx?folder=33fe0c2b-6ddb-4953-a64d-6c3f81aa698c&file=1.jpg
  13. brvs2014

    Weld Pipe # 1500 WITH A FLANGE # 2500 NEED TRANSITION OR WELD DIRECTLY?

    In the oil station there is a very old system of Water Rejection, due to its age the existing pipe is in very bad conditions, for this reason it has to be replaced, the old line to replace this designed with class # 2500, however to the Checking the pressure gauges on the HPS pumps shows that...
  14. brvs2014

    Weld Pipe # 1500 WITH A FLANGE # 2500 NEED TRANSITION OR WELD DIRECTLY?

    I have a pipe 6 "# 1500 but my Tien-in should do it on a # 2500 valve, the SCHD is the same for # 1500 and # 2500, you can either weld the flange directly to the pipe or I should relay transition by difference Thicknesses ??
  15. brvs2014

    Plant and Profile Trasnmision Line direct Buried

    Where can I find information to design the plans of Plant and Profile of a line of Direct tension underground, where I find examples .pdf or .dwg
  16. brvs2014

    How to enter support from an .text file

    I need to enter support in a pipeline of 3 km in length, I must place them every 8 meters, I appreciate your help with information if you can automate this from a .text file so you do not have to put them 1 by 1.
  17. brvs2014

    Differences between Pipe, API 5L X42 Psl1 and Pipe, Api 5L X42 Psl2

    Differences between Pipe, API 5L X42 Psl1 and Pipe, Api 5L X42 Psl2
  18. brvs2014

    Rating #150 o Rating #300 in stations or Platforms?

    Within oil stations, oil platforms that rating is recommended # 150 0 # 300 ?? Is this indicated in ASME B31.3? I consult it because since the pressures are very low I am considering Rating # 150, if I am wrong I would greatly appreciate your help.
  19. brvs2014

    What standard should be used to design vents in jacketed pipes at asphalted road crossings?

    PREVIOUSLY, A 12 "PIPE FOR PROTECTION OF A FUTURE PIPE WAS REQUIRED TO USE A TUNER FOR THE SPECIAL CROSSING, HOWEVER, THANKS TO THE 12" PIPE EXISTING IT COULD AVOID THE WORK TO USE TUNER, NOW IN STOCK WE HAD NO TDW CAPS 12 "x 6" we only had 10 "x 6" caps, so in the diagram you can see that there...
  20. brvs2014

    Design Tee and Barred Tee Datasheet

    LittleInch : Correct that is what I am looking for. regards

Part and Inventory Search