Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. Bravo8

    Sanitary sewer for existing and proposed facility

    I have a project where a proposed building location is on top of an existing sewer lateral from an existing facility. The proposed building location is between the existing facility and the main sanitary line. There is no room to move the proposed building. I recommended to relocate the existing...
  2. Bravo8

    Gravel Parking Lot Slopes

    I use a minimum of 2% slopes in gravel parking lots. My client wants to use 1% slopes due to the amount of fill that will need to be brought in from off-site. I explained the risks of using a slope less than 2% to the client, but he is willing to take the risks. Will I be liable when potholes...
Back
Top