Thanks for all the help so far.
The building is fully sprinklered. 1500 gpm is the minimum per Appendix B.
I did not design the site water system, there are 3 buildings in this phase and my understanding is that they won't let site water work continue until this issue is resolved. Makes...
I'm a plumbing and fire protection designer. I have a fire chief who is upset at the architect for using Type V over Type 1 construction. We have a hydraulically designed building that requires 486 gpm with an additional 250 outside hose. Flow is 55 psi at system demand.
The fire chief is...