In old AASHTO (LFD) the maximum steel contribution in shear is limited to Vs_max = 8 sqrt_f'c b d. In LRFD AASHTO, there are 2 equations for the shear capacity, the lesser one will govern. So I tried to compare between them and I got about 2.47 times difference. My current design using the LFD...