Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. babman

    Blind Flange on Pressure - Class Inspection requirements

    Hi TGS4, Sorry if I haven't provided enough info for someone to follow on my query - I tend to write essays when only a paragraph is required, so I tried to keep my question as brief as I could. The vessel details are:- - classic cylindrical pressure vessel, vertically mounted with 2:1...
  2. babman

    Blind Flange on Pressure - Class Inspection requirements

    Hi, This post is in relation to my first post about blind flanges a few weeks ago. Essentially we have redesigned the upper head on a vertical process vessel to include a 8" handhole/inspection/removal hatch to remove a internal demister pad which has caused issue on several other projects...
  3. babman

    Nozzle Penetration through Blind Flange

    Thanks for all the replies. Definitely the advice I was looking for!
  4. babman

    Nozzle Penetration through Blind Flange

    First post on here, so be gentle with me! Can't say enough good things about this forum - especially for a young engineer - it has given me lots of design pointers and guidance in some tricky situations. I was wondering if I could gather some advice on placing a nozzle penetration through a 8"...

Part and Inventory Search