Thanks SnTMan & MikeG7.
So to conclude, as per footnote 36, it is not mandatory for the designer to calculate the MAWP of the system. Instead one can limit the MAWP of the system to design pressure and use the same to calculate Hydrotest.
I am currently checking an fixed tube heat exchanger design with the help of Compress as per Section VIII .
Since I am restricted to using standard pipes due to availability for Shell and Nozzle material, the MAWP of the said HX is 3 times higher than that of the design pressure and the nozzle...
I have calculated the minimum required throat as per UW-20 sketch (d) full strength joint, but I am not able to establish a relation with the minimum leak path and the throat. The ASME Section IX requries "minimum leak path dimension required by the design".
Thanks
Kunal
Hello,
I need to establish a relation between minimum leak path dimension (Section IX) and minimum weld throat (Section VIII Div-1 UW 20) for Tube to tube sheet joint. Does anyone have any literature pertaining to it?
Thanks,
Kunal
Thanks Mike.
Although I do agree that there is no particular restriction on the angle, all the sketches, both vertical and horizontal dimensions are indicated as 'ag'. which made me come to the conclusion that the angle is bound to 45 deg. Just wanted to make sure that increasing the angle...