I have a project with permanent soldier H-beam wall with lagging. It is embedded into the bedrock below excavation via an oversized cored hole, filled with lean concrete (2.5 ksi). I have modelled this in L-Pile and have checked the bending resistance and the shear resistance. Bending is fine...