Yes i try to cure rubber in same time.
The coating application is in a spary cabin explosion proof. When rubber parts enter hot air ovens all solvant is flash off.
Q) Urethane melt point is above or under 250 degres celcius?
Hi im applying water based urethane coating on a rubber surface at 130 degres celcius. Curing time is 120 sec and surface of the rubber goes up to 250 degres celcius. I got bad result on solvant resistance with Naphta. Result is better when i lower temperature but the rubber is not cure enough...