Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Hany MH

    construction joint in shear wall passing through vertical bar splices

    OK but I mean that splice to be above or below this construction joint not to intersect this joint
  2. Hany MH

    construction joint in shear wall passing through vertical bar splices

    I know that there's transverse tension at splices which resisted by concrete (concrete at construction joint may be weak) in addition to previous we need to extend bars above construction joint by minimum lap splice to ensure that there will be sufficient length for splice after casting concrete
  3. Hany MH

    construction joint in shear wall passing through vertical bar splices

    Usually in cores and shear walls, one extends vertical bars above the construction joint a distance at least equal to the lap splice length to allow for splicing bars away from the construction joint. I asked if the splices are intersecting the construction joint (i.e that part of the splice is...

Part and Inventory Search