Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: pwwj
  • Order by date
  1. pwwj

    Size Overlow Structure and Orifice Dia

    Hi, I'm new to storm detention design. Current I have A PROJECT NEEDS TO REPLACE TWO OVERLOW STRUCTURES W/ A LARGER SIZE OVERFLOW STRUCTURE, KEEPING IE same (known), KEEPING POND STORAGE SAME (number unknown). so is there any easy way to calculate or any software for the new overflow structure...
  2. pwwj

    Fish Passage Design - Maximum Velocity

    I'm doing a fish passage box concrete culvert design using STREAM SIMULATION design option, from HY-8 the Velocity at outlet (10 Years discharge) is 9 f/s, more than the standard requires maximum velocity for fish which is 5 f/s. One is that right? some one tells me if using STREAM Simulation do...
  3. pwwj

    Cul-de-sac design plan

    Hi, this is my first time do the Cul-de-sac design. I know I should show the Cul-de-sac center line proposed profile on Plan sheet, but Not sure if I need show the proposed Pavement Edge profile on plan sheet. if not shown in plan sheet, using the cross section to control the pavement edge...

Part and Inventory Search