Hello,
Previously, I worked for a few years with C&S consultant. However, due to some workplace conflicts that harmed my mental health, I resigned from my position. I've been working in HR and data for nearly three years now. I recently realized that I am not suited to these fields and am...
Hello all,
Is it recommended to flush the top of purlin with top of truss? This is due to the constriction of truss height allowed by the architect. Would there be any issue there? The trusses and purlins are off steel.
Thank you.
Hello all,
Would like your help if you can point out to me guidelines or sample on the design calculation/steps need to be taken to do design check on existing RC beams with opening as the beams was previously not designed with to include the opening.
Thank you.
Hello everyone, hi
I would like to ask for your opinion. How do you do detailing for column transition in size and shape? For example, my lower column is rectangle of dimensions 350x1200 and it transitions to square (650x650) and some to another rectangle (650x750). What are the requirements...
Hello hi all,
Would like to ask your opinion/experience in designing rc column. The situation is it is a 10-storey high residential building. Lower floors say until level 5, the columns are square (eg. 600x600), however from level 5-8, the architect would like to change it to circular (eg 700...