Hello,
I'm going to design a Tie-in on existing Firewater ring (in refinery area)between n.2 PIVs.
I need to install a Gate Valve, only for tie-in purpose (valve will be locked open).
Is this GATE VALVE needs UL/FM certification? Is written in some NFPA?
Regards,
Marco