Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  • Users: DBallz Sprinklerz
  • Order by date
  1. DBallz Sprinklerz

    field surveys

    Thank you
  2. DBallz Sprinklerz

    field surveys

    my first job, the head field super, takes my drawing and says 'this is what we do with your drawings in the field', and crumples it up and throws it in the garbage. then i move states, get a job at a top notch company where they actually do real sprinkler work, and i throw it away to go to...
  3. DBallz Sprinklerz

    field surveys

    and then, what if the company doesn't care about the survey, and you go out when you're not supposed to, then they think you're stealing time, and you get fired? how does that work?
  4. DBallz Sprinklerz

    field surveys

    this is all assuming this is a real job, and not some type of government targeting operation. don't the fitters just figure it out in the field? if i have an estimator's drawing already, how much more can i really contribute by 'surveying' the existing system?
  5. DBallz Sprinklerz

    field surveys

    how do you guys know when you are supposed to survey something, or when you can get away without a survey and just fudge something on the plans?
  6. DBallz Sprinklerz

    sprinkler industry question

    SHOULD'VE calmed down, wasteofadegree, you were golden and in a good place, now look at you
  7. DBallz Sprinklerz

    can you cut into a 1" branch to add a sprinkler?

    Can you do it? -defeated but not destroyed sprinkler designer
Back
Top