Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SSS148 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. midstreamab

    Pipeline Crossing via Horizontal Directional Drilling - Drill pipes stuck 10 ft underground

    I'm curious as to how you installed 16" casing, but are reaming up to 54"? The reamers will have to go through the casing/conductor pipe. How long have you tried the fishing operations? Sometimes it takes days of trying and tripping in and out of the hole before you grab on what you need to.
  2. midstreamab

    Installation Temperature versus “Lock-in” Temperature for HDD Sections

    Previous thread for background: Link Question: Does anybody have any experience pre-heating HDD sections to mitigate excessively high longitudinal stress after installation during winter pipeline construction? I don’t see how the pipe heating procedure would apply to HDD sections as they are...

Part and Inventory Search